Crown replaced the EPDM roof on a working downtown hotel opposite the Aquarium, phasing the work around guests and threading a new membrane through vents, HVAC curbs, and skylights.

A high-rise hotel in the middle of downtown Boston, full of guests, with the work happening several stories above one of the city's busiest streets.
The existing membrane was crowded with penetrations - vents, HVAC units, skylights - and every one of them needed a flashing built for it, not approximated in the field.
The hotel stayed open the whole time. Staging, deliveries, and tear-off debris all had to move through a dense downtown block without taking the street or the lobby out of service.
Documented, sequenced, and largely self-performed. Here is how the work came together on site.
Every vent, curb, and skylight was detailed before tear-off, so each one got a flashing designed for it rather than a field improvisation.
The roof was replaced in sections, each phase timed to periods of lower guest activity, with noise-reducing methods used to keep the hotel quiet.
Access and staging were planned around downtown traffic and pedestrian flow, with safety controls sized for work that high off the street.
Crown's first campaign here installed a new-construction rubber roof when the hotel was expanded by two stories. A later campaign replaced the remaining older section.
The Harborside Inn is covered end to end by roofs Crown installed, across two campaigns, without the hotel ever going offline.
Slate and copper, done right.
Restoration is Crown's craft. If your building carries a historic slate or copper roof, see how we keep it watertight for another century.
Tell us about your building and what it needs. We will schedule a no-obligation assessment and walk you through what restoration or replacement actually involves - with no pressure to over-build.